NASA Stennis Space Center Roof Repair/Replacement
Agency: | DEPT OF DEFENSE |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159812051130176 |
Posted Date: | Feb 2, 2023 |
Due Date: | Feb 17, 2023 |
Solicitation No: | W912HP23R4000 |
Source: | https://sam.gov/opp/56372f0ff9... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Sources Sought (Original)
- All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Feb 02, 2023 08:34 am EST
- Original Response Date: Feb 17, 2023 03:00 pm EST
- Inactive Policy: 15 days after response date
- Original Inactive Date:
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1JZ - CONSTRUCTION OF MISCELLANEOUS BUILDINGS
- NAICS Code:
-
Place of Performance:
Stennis Space Center , MS 39529USA
Purpose of this Announcement:
The U.S. Army Corps of Engineers, Charleston District, has a requirement for a NASA Stennis Space Center Roof Repair/Replacement project. This announcement constitutes a Sources Sought Synopsis (market survey). This is not a Request for Proposal (RFP). This is not a follow-on contract. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract.
The purpose of this Sources Sought synopsis is to determine interest and capability of potential qualified Small Business, Certified 8(a) Small Business, HUBZone Small Business, Woman-Owned Small Business firm and Service Disabled Veteran-Owned Small Business firms relative to the North American Industry Classification Code (NAICS) 236220, Commercial and Institutional Building Construction. The Small Business Size Standard is $39.5 Million. To make an appropriate acquisition decision for the above project, the Government will use responses to this sources sought synopsis. If inadequate responses are received, this solicitation may be issued for full and open competition. The order of magnitude for this effort is estimated to be between $10M and $20M
Project Information:
This will be a design build construction project consisting of repairing damage to twenty-four (24) buildings in close proximity of each other at NASA - Stennis Space Center (SSC), Mississippi. The work is to repair damaged roofs observed immediately after Hurricanes Zeta and Ida. Work shall include roof replacements of 24 miscellaneous roofs including demolition and installation of new roofs as well, roof deck repairs/replacements and demolition of installation of lightening protection systems. Total of ~825.45Ksf for all buildings. The intended roof covering for replacement is TPO.
Note: (1) If the decision is to Set-Aside this procurement for HUBZone Small Business, the contractor shall be required to perform in accordance to 13 Code of Federal Regulation (CFR) SUBPART 126.700. (a) A qualified HUBZone Small Business receiving a HUBZONE contract for general construction must perform at least 15% of the contract either itself or through subcontracts with other qualified HUBZONE Small Business concerns.
Note: (2) If the decision is to Set-Aside this procurement for Service-Disabled Veteran-Owned Small Business, the contractor shall be required to perform in accordance to Federal Acquisition Regulation (FAR) 52.219-14 Limitation on Subcontracting (b) states, “The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.”
The Contractor shall be capable of providing Performance and Payment Bonds and shall begin work after acknowledgement of the Notice to Proceed.
Completion time for this project will be specified in the solicitation. If the contractor fails to complete the work within the specified number of days, the contractor shall pay liquidated damages to the Government in the amount specified in the contract.
If you can meet all of the requirements for this project and the information in the questionnaire, please respond to this sources sought synopsis by email to Shirley Lawson. The e-mail address is Shirley.a.lawson@usace.army.mil. Send a courtesy copy (cc) to addison.g.layfield@usace.army.mil . Email is the preferred method when receiving responses to this synopsis. Response must be received no later than 3:00 P.M. Eastern Standard Time, on 17 February 2023. Late responses may be considered, however interested parties are advised that an acquisition strategy decision will be approved ASAP after the deadline, and as such the Government reserves the right to disregard late responses. Please submit the following information and the information required in the attached worksheets:
Sources Sought document is attached
Document | File Size | Access | Updated Date |
|
130 KB
|
Public |
Feb 02, 2023
|
- KO CONTRACTING DIVISION 69A HAGOOD AVENUE
- CHARLESTON , SC 29403-5107
- USA
- Shirley A. Lawson
- shirley.a.lawson@usace.army.mil
- Phone Number 8433298164
- Addison G. Layfield
- addison.g.layfield@usace.army.mil
- Phone Number 8433298194
- Feb 02, 2023 08:34 am ESTSources Sought (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.