Town of Summit Water System Improvements CDBG Project No. 1138-22-352-PF-01 Pike County, MS
Agency: | Dungan Engineering |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD16784428208364246 |
Posted Date: | May 10, 2023 |
Due Date: | Jun 20, 2023 |
Source: | https://dunganeng.com/bids/tow... |
Project Owner:
Town of Summit
Project Manager:
Brock White
Dungan Project #:
2044C025
Pre-Bid Conference: N/A
Bid Date and Time: 06/20/2023 @ 10:00 AM
P&S Cost:
Electronic copies of P&S are available at no cost. Physical copies are $100.00 and nonrefundable.
Project Description:
The work involved in the project includes the replacement of electrical/control equipment at the Peters Street Water Treatment Plant and rehabilitation of an existing 100,000 gallon concrete clearwell and replacement of an 1,000 gallon aerator at the MLK Jr. Drive Water Treatment Plant.
Engineer Estimate:
Only bids from contractors who received bidding documents from Dungan Engineering or when applicable from the designated electronic bidding site will be opened.
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.